FORKLIFT TERMINAL PROJECT CHECKLIST IO Resource | Project scoping worksheet Company / project: Contact / email: Site and country: Required quantity / rollout date: APPLICATION AND CURRENT INSTALLATION WMS / application / version: Software partner or implementation contact: Current terminal model / operating system: Browser, native app, remote desktop or terminal emulation: Required software licences and management platform: VEHICLES AND MOUNTING Truck make / model / quantities: Nominal vehicle voltage: Approved accessory power connection (installer to confirm): Proposed mounting position / available space: Existing mount, cables and power components (part numbers if known): Photos of mounting area and proposed cable route: Installation provider and responsibility for electrical checks: ENVIRONMENT AND WORKFLOW Tasks performed from the truck: Operating temperature range / cold-start temperature: Transitions between chilled, frozen and ambient areas: Humidity / condensation / cleaning methods: Gloves and touch input requirements: Scanner / keyboard / printer models and interfaces: Wi-Fi roaming areas and session recovery requirements: EVALUATION AND SUPPORT Agreed pilot tasks and acceptance criteria: Ignition-off / shutdown / reconnect behaviour to test: Required security support life: Spares, warranty and repair requirements: Send the completed details with a project enquiry at: https://ioresource.com/contact?tab=quote This worksheet scopes a quotation. It is not an installation instruction or confirmation of vehicle, software or accessory compatibility. Exact hardware, mounting, power, warranty, availability and installation scope are confirmed for the project.