
Windows / Linux
Advantech DLT-V73
Windows warehouse clients, remote desktops and projects requiring x86 software.
10.4-inch / 12.1-inch · IP66 enclosure · Vehicle mounting options
Explore Advantech DLT-V73 →Advantech · Warehouse mobility
Fixed forklift computers for receiving, put-away, picking and dispatch. Choose your application platform, then build the mounting, power and scanning solution around it.
Trade project enquiries · Ireland & UK · Configuration and staging support

Start with your software
Match the terminal to the WMS, remote session or browser workflow you actually run. Then confirm the screen, accessories and environment for each vehicle.

Windows / Linux
Windows warehouse clients, remote desktops and projects requiring x86 software.
10.4-inch / 12.1-inch · IP66 enclosure · Vehicle mounting options
Explore Advantech DLT-V73 →
Android
Android warehouse applications and browser workflows validated for a fixed terminal.
10.4-inch / 12.1-inch · IP66 enclosure · Vehicle mounting options
Explore Advantech DLT-V73A FL →
Built around the operator
Put the warehouse application where it is needed: in the truck cab. Plan a screen position that works with the operator’s reach, gloves and line of sight, then test it through a normal shift.
Receiving, put-away and picking each bring different demands. Match the terminal, scanner and mounting arrangement to the actual job.
Plan mounting and power →Confirm OS, WMS client, session recovery and software licences before choosing hardware.
Match mounting, voltage, ignition control and cable routing to the actual truck.
Evaluate scanning, gloves, Wi-Fi roaming and any printer connections over a normal shift.
Ask for an itemised proposal covering terminal, mounting and power, Datalogic scanning and Bixolon printing where suitable. Accessories, licences and installation responsibilities are agreed per project.
Buying guide
Start with the warehouse application, then match the screen, operating system and installation to the truck.
Installation planning
What to collect before specifying brackets, cables and vehicle power.
Environment guide
Separate cold operation, cold starting and condensation before choosing a configuration.
Migration guide
A practical evaluation plan for changing the hardware in a working warehouse.
Specify the exact model and assess cold starts, condensation and defrost requirements. The Android FL operating and boot-up limits differ; read the cold-store guide before selecting a configuration.
Validate the application, licences and peripheral connections in an agreed evaluation. A shared operating system does not guarantee compatibility.
Availability, delivery timing and warranty terms will be confirmed for the quoted configuration. Do not plan a rollout around an unconfirmed stock date.
Send your application, truck quantities, voltage, environment and target date. We will scope the hardware and checks your project needs.
Request a forklift terminal quote →